WebHace 23 horas · At around 10 feet down, he was too deep to toss out the dirt, so he fetched a five-gallon bucket that he tied by rope to a root at the tree’s base. When the bucket … Web22 de abr. de 2024 · Step 4: Determine the Volume. Calculate the volume of the trench by using this formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an average width of 2.3 feet and an average depth of 5 feet has a volume equal to (12 x 2.3 x 5), or 138 cubic feet.
Topsoil Calculator - How Much Topsoil Do I Need
WebGenerally, a yard of dirt weighs between 1,500 and 3,000 pounds. The reason for such a large range is that the composition of the soil can vary. Additionally, differences in moisture levels play a role, as well as how compact the dirt is when it’s measured out. To put it simply, a yard of topsoil is heavy, but you’re also getting a lot of ... WebCalculator Use. Calculate (estimate) roadway or parking lot material fill requirements for construction or maintenance projects. Allows common road materials or custom entry so … fix gmod crashing
Cubic Yards Calculator and Price Estimator
WebA cubic yard is equal to 27 cubic feet. You can use the online calculator to determine how many cubic yards of material are required. As a general guide, 1 cubic yard of … WebSOD. To figure out how much sod you need, measure out the area; get the length in feet and the depth in feet. Multiply these 2 numbers together to get total square feet. Divide this number by 9 to get square yards. Sod is sold by piece and by square yard (which is 2.25 pieces). SQUARE FEET / 9 = SQUARE YARDS. fixgo activation code